Complete electrical and mechanical fitout for the QPR home changing rooms, including power distribution, lighting design, HVAC installation, and building management system integration.
QPR required a complete overhaul of their home changing room facilities to meet modern Premier League standards. The existing M&E infrastructure was outdated, with insufficient power capacity, poor lighting quality, and an aging HVAC system that struggled to maintain comfortable conditions. The works had to be delivered within a tight close-season window with zero disruption to adjacent stadium operations.
Our team designed and installed a complete M&E package: a new sub-distribution board with dedicated circuits for each zone, high-efficiency LED sports lighting with smart controls, a zoned HVAC system with heat recovery, full BMS integration for remote monitoring, and a new mechanical ventilation system with humidity control. All works were carefully sequenced around the stadium's operational schedule, with night-shift installation in critical areas to maintain safety and minimise disruption.
The project was delivered on time and within budget, transforming the changing room into a modern, energy-efficient facility. The new systems reduced energy consumption by an estimated 35%, improved air quality and comfort for players and staff, and provided the club with a robust, future-proof M&E infrastructure. The BMS integration gives facilities teams full visibility and control over all systems in real time.
35%
Energy Reduction
12 wks
Project Duration
6
Systems Integrated
01 — Home changing room — overview with QPR crest floor inlay
02 — L-shaped locker configuration with ambient blue LED
03 — U-shaped locker room with integrated bench seating
04 — Dugout seating with embroidered QPR crests
05 — Dugout seating with tubular heating and cable management
06 — Medical treatment room with QPR-branded mirror
07 — Treatment room — physio couch and storage
08 — Corridor with blue LED cove lighting and emergency signage
09 — Recessed ceiling with integrated blue LED strip
10 — Ceiling detail — downlights and air diffusers
11 — Wall-mounted LED controller, switches, and Samsung thermostat
12 — Shower facility with chrome rainfall shower heads
13 — Samsung HVAC outdoor units with isolators and cable trayLet's discuss how we can deliver the same level of quality and reliability for your next M&E project.